Skip to content
Free Website Check Menu
Free Website Check WhatsApp +27 82 491 5003

Up to two weeks of admin, replaced by one form

From one form: the client’s file online, a version for site staff, and the printed pack.

Client
Sunbird Solar
Work
Portals and internal tools
A laminated site label for the made-up Northgate Retail Park, with a QR code to scan for the procedures, as-built drawings and commissioning documentsThe site staff’s handover file on a phone: procedures, as-built drawings and commissioning documents onlyThe client’s handover file on a phone, for the made-up Northgate Retail Park, everything from procedures to contracts
The client’s file and the site’s file on phones, and the label on site. The client, site and system are made up. The portal is real.

The bane of the admin team

Every installation Sunbird finishes ends with a handover file for the client: the cover, the system details, the headline figures and the supporting documents.

Put together by hand, one file took one to two weeks, and it came out bulky and heavy to read.

Fill in, check, print

A form on one side, the finished file on the other.

One form
Which company it comes from, the client, the site, the handover date, the type and size of system, and the headline figures for the cover.
Live preview
The cover and pages change as the form is filled in, so you see what will print before you print it.
Ready to print
Saved as PDFs and printed the same way every time.
Handover builder: the form on the left and a live preview of the handover file cover on the right, for a sample client
The form on the left, the file’s cover on the right. The client, site and system are made up. The builder is real.

One click away, on site and off

Now the client gets an email with a private link to their own site, with the whole file on it. It’s one click away whenever they need it.

On site, a laminated QR code takes contractors and site managers to a version for site staff, with the safety procedures, the as-built drawings and the commissioning documents. Contracts, warranties and prices stay in the client’s file, so nothing commercial is ever a scan away.

The printed pack and spine still come from the same form.

The client’s handover file on a phone, for the made-up Northgate Retail Park: procedures, as-built drawings, commissioning, equipment data sheets, warranties, operations and maintenance, and contracts, each document one tap away
The client’s file: everything, including contracts and warranties.
The site staff’s handover file on a phone, for the same made-up site: the procedures, the as-built drawings and the commissioning documents only
The site’s file: procedures, drawings and commissioning. Nothing commercial.
A laminated site label for the made-up Northgate Retail Park, 1,200.1 kWp, with a QR code to scan for the procedures, as-built drawings and commissioning documents
The label on site. Scan it for the drawings.
Commercial buyers can cost solar before they call

Next case: Sunbird Solar website

Previous case: Procurement portalAll work

Business systems

Starts with a two-week Systems Review, credited against the build.

See prices and first steps

Start with the free Website Check.

Your site scored out of 100 across speed, mobile, Google, trust, enquiries and email, in seconds, with the fixes ranked by what they cost you.

Enter a website address, for example yourbusiness.co.za.

Free. Your score out of 100 in seconds, then the full report by email.

Rather talk first? WhatsApp Luke